Today the base for the foundations were prepared. We have a 2 block high wall with a subbase of hardcore thats been compacted with a whacker plate.
Some more drainage has been done as well with the soak away having been covered over and a couple of pipe holes laid. As you can see from the pic above the old house wall is still part of the foundations as its going to be tougher than the concrete we are adding. Tomorrow is another smaller layer of hardcore to add on and whack down and the final piping for the waste. We have had about 5-6 people here today at various stages. Also the front looks like a bomb has hit it with a huge pile of hardcore, a cement mixer, a pile of polystyrene for the foundation and a pile of rubble. Also my gravel drive has disappeared into the hardcore founation. Also our walk we noticed that the grab truck has made some indentations in the path which have then caused cracks in the wall at the front.....best let Richard know!