Day 17 saw a full cast of James, Paul and Derek arrive bright and early and after a little discussing of a couple of flaws in the drawings, Bob forgot about the step in the upstairs on cut-through drawing which meant we will have to change the upstairs flooring to accomodate a lintel which would have otherwise created a 'lump' in the floor across the length of the upstairs of the extension. Instead the change in flooring will mean a lowering of the downstairs ceiling by 5cm, no great loss.
With that out of the way the guys cracked on and by the end of the day we had full scaffolding all round and bricks up on the scaffold ready for building work to resume. A chat with Pete from over the road reveals there was some scrathing of heads due to power lines and telephone lines round the front with a third delivery of breeze blocks and bricks.