Monday, 2 June 2008

Day 31 - Even Slower Progress

Still no delivery so today was a case of taking out the rest of the back wall of the house before the roof starts. At least the bath and bidet are no longer playing centre stage in the new extension and all the rest of the debris has been removed or piled up on the montain at the front. There isn't really a great deal they can do now though so lets hope the delivery arrives soon.
As you can see everything is no ready for trusses and the like for sorting out the roof.The back of the house is now pretty bare withe the windows to the existing bathroom still boarded up, there is nothing left to do now until the roof is watertight and they can then knock in to the existing house.