Today the guys finished the brickwork for the cloakroom, the wall to the left of the doorway has been put up and the joist over the doorway has been added. The hole around the soil pipe has been filled and concreted flat ready for plumbing to proceed. Outside the same applies, the hole has been filled and the inspection cover concreted round to grant access down the side of the house again.
James has carried on with the tiling, more lines of tiles have been put up near the ridgeline and along the gable end and work has started on the gully connecting the new and existing roof. Friday Foxy will be back on site and possible Phil or TV Tony.