Nigel finished wiring up the under cupboard lights in the kitchen as well as the extractor fan in the utility room.
Paul arrived early and cleared the back patio and front of any spare bricks and tiles that I no longer need. The RSJ has gone as well as the plastic guttering that was left over. The place is looking decidedly better. He has also said he will order me some more pea gravel to replace the drive covering that ended up in the footings.
Roger was here again working on the boiler, it looks as though it is all piped in now and the minor change required to reroute the study radiator has also been done. We are STILL awaiting the oil tank.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment