Phil came today to fit the remaining radiators and towel rail, the cloakroom has its new rail which means it is now complete except for a final lick of paint on the pipework.
A new radiator has been put in the study replacing the old one with the under-window style, finally a radiator has been put in the hallway as with the extended length of the room having knocked through the porch the nearest radiator is now in the kitchen.
Paul came and filled the old waste from the toilet and the hole that had been made for the bath waste in the previous bathroom, I have been left a note to bond the floor in the kitchen ready for Richard and Ashley to put a final self levelling compound on top prior to your truly tiling the floor.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment