Wednesday, 6 August 2008

Day 75 - Utility Walls Done

The utility room walls are now complete. Phil has connected the old radiator from the old bathroom and made use of it in the utility room, the other two radiators and the moved one have also been piped up ready for the flooring over the top.

Hazel came round to talk to us about Howdens kitchens and said she would go away and draw up some plans for room designs, hopefully for early next week.

Tony has been about too doing pieces here and there. We have electric points inside the old lounge now and the white trunking on the outside of the house has been removed. He can't really move on with the kitchen due to waiting for the designs to return so we are a little held up now.